• John Armitt Recognising The Contribution Made By The WARM Team
  • A Vast Amount Of Ballast Was Delivered To Site During The WARM Project
  • Laying Ballast After Provision Of A New Track Section
  • Controlled Lifting Of A New OHLE Mast
  • Final Adjustments To A New Platform Signal
  • Installation Of New Level Crossing Decking
  • Construction Of Anti-Trespass Guards
  • Checking The Line Is An Important Task
  • Many Staff Make Light Work
  • Removing A Platform Starting Signal At Chingford
  • Heavy Cutting Gear Strong Enough To Deal With Rail
  • Spectacular Image Of A Technician Demolishing A Redundant Signal
  • Disconnecting And Removing A Redundant Ground Position Signal (
  • Drilling Holes In The Rails For Connection Of Track Circuit Tail Cables
  • Removal Of The Old Barrier Machines At Enfield Lock Level Crossing
  • Stansted Express Passing Enfield Lock Level Crossing After Commissioning
  • A Grant Rail Tamping Machine Following A Successful Night Shift
  • A Grant Rail Tamping Machine Following A Successful Night Shift
  • Checking Ground Frame Connections Prior To Removal
  • The Alliance Board Celebrates The Success That The WARM Project Delivered
  • Amec Spie Rail Check Heights And Staggers On The Overhead Lines
  • Removing Redundant Overhead Line Structures
  • Using A Crane To Carefully Deliver Cabins Under The Overheads
  • Final Checks At Highams Park Level Crossing Before Commissioning
  • Removal Of Redundant Barrier Machines At Highams Park Level Crossing
  • Multi-Disciplinary Stageworks At Highams Park Level Crossing
  • Installation Of A New Overhead Line Mast
  • Delivery Of A New Relocatable Equipment Building (REB)
  • Lifting Existing Level Crossing Decking Prior To Renewals
  • Using On-Track Equipment To Lift Old Track
  • Recovering Redundant Location Cases During A Night Shift
  • Hustle And Bustle During An Early Morning Shift At Highams Park Level Crossing
  • Erection Of A New Platform Starting Signal
  • Checking The Installation Of New Points At Chingford
  • Laying New Track
  • Track Work At Northumberland Park Level Crossing
  • Working On The Overhead Lines Required Careful Planning And Controlled Disconnections
  • Westinghouse Technicians Installing New Barriers
  • Re-Ballasting During The Night At Northumberland Park Level Crossing
  • Technicians Working Inside Bishops Stortford Relay Room
  • The WARM Project Ensured That Recoveries Were Performed As Soon As Possible
  • Recovering Exisiting Ducting Routes At Bishops Stortford Station
  • Recovering A Redundanct Signal Near Northumberland Park Level Crossing
  • Dramatic Night Shot Of Work Taking Place At Windmill Lane Level Crossing
  • Installation Of Edging Beams At Highams Park Level Crossing
  • Removing Old Level Crossing Decking Panels
  • Demolition Of A Redundant Signal At Broxbourne
  • Westinghouse Technician Working In Sawbridgeworth REB
  • Excavation Work For A New Signal Base
  • Using A Road-Rail Vehicle To Dig Out An Old Signal Base
  • Erecting A New Signal At Broxbourne
  • Cutting Down An Old Signal - Possibly On Bonfire Night!
  • Careful Removal Of Spelbrook Signal Box - Bought By A Collector
  • Many Staff Working Towards A Common Goal At Highams Park Level Crossing
  • Laying Track From An Engineering Train
  • Grant Rail Staff Conducting Tamping Operations
  • Tamping New Track In The Vicinity Of Highams Park Level Crossing
  • Two Vehicles Performing Tandem Lifting Of Track
  • Westinghouse Technicians Performing TPWS Testing At Stansted Station
  • Night Time Track Welding Provides A Brilliant Display
  • Track Laying At Northumberland Park Level Crossing
  • An Engineering Train Passing Over Level Crossing No. 40
  • A Train Passing Through Roydon Prior To The WARM Project
  • P-Way Works In The Vicinity Of Northumberland Park Level Crossing
  • Testing Track Circuits At Ware Level Crossing
  • Westinghouse Testing Point Renewal Works
  • Staff From Alfred Mcalpine Constructing Ducting
  • Final Decking Laying Prior To Commissioning Windmill Lane Level Crossing
  • Careful Observation Of Heavy Equipment Removal
  • Preparing To Remove An Item Of Heavy Equipment
  • Working In A Location Case
Thumbnail panels:
Now Loading